What should be paid attention to during the welding process of automatic ring seam welding machine
2025-03-10

What are the areas that everyone must pay attention to during the entire welding process of the automatic ring seam welding machine?


1. Fully automatic circumferential welding is a full process of rapid heating and cooling. The private aircraft area where welding is carried out cannot expand or contract freely due to the restraint of the product workpiece. Therefore, after cooling is carried out, stress and deformation will occur in the welded parts. At this time, customers do not need to come close to prevent burns and bubbles.


2. When welding thick steel plates with electric welding, in order to be able to penetrate various shapes of welds given at the edges, it is very easy to apply welding wire or welding rod. The appearance of weld seams is different. When selecting the appearance of weld seams, in addition to considering penetration, the convenience of construction in electric welding engineering should also be taken into account. Small amounts of metal materials can be added, and factors such as low deformation and low production and processing costs of weld seams can be considered.


3. When automatically welding two thick steel plates with different thicknesses in the circumferential seam, in order to prevent significant changes in cross-section that may cause severe stress, the commonly used method is to thin the thicker stainless steel plate, so that the thickness of the two stainless steel plates is the same.



About us
Company Profile
Corporate Culture
Qualification Honor
Products
XNL-F Series
XNL-U Series
XNL-k Series
XNL-HFM Series
XNL-HFG Series
XNL-HFZ Series
Customized Welding Equipment
XNL-MF Series
XNL-IL Series
XNL-CJ Series
XNL-GB Series
XNL-M Series
Non-standard Customization
Applications
Water Treatment
Biological Pharmacy
Petrochemical Industry
Aviation and Aerospace
War Industry
Nuclear Power
Construction Machinery
Semiconductor
News
Company News
Industry News
Contact Us
Tel: 18261010575
Email: 961519567@qq.com
Add: Room 1, Shenghan Industrial Park, 297 Jingtang South Road, Qiandeng Town, Kunshan City, Suzhou City

【Scan follow us】

【Scan contact us】

Copyright © 2021 Suzhou Line Energy Intelligent Welding Equipment Co., Ltd. All rights reserved